ramses01 said:
Actually, projecting ballpark cost estimates is fairly simple. All one really needs is average team size as the bulk of the cost is in the people. Multiple team size and length of development by ~$150,000 per team member year. Given the length of development for KZ, I would think that $60M is probably on the low side. |
ok do the mat. if those 120 employees are all devs (which i doubt) and its 100k per year not 150k. you have 12mil a year. times that ny 3.5 years and you have 42mil







