gtotheunit91 said:
Well, considering Todd is American and in America midway and halfway mean the same damn thing, I doubt there will be much lost in translation But, I would certainly still like some clarification as still that's an odd thing to say that he's midway through executive producing. I'm guessing he's half done through his specific job? |
Actually if you go by the context of that statement, It only sounds like they are midway through a particular point in development but that does not translate to midpoint in the entire project. With development, there are multiple development points and each can have a set date for completion so I really would not take his statement to really mean anything beyond the specific context he makes.