DonFerrari said:
Yep you are right on your assumptions imho. What we do know is that Sony got to meet their demand faster than Nintendo, but we don't really know if that was because Nintendo had a harder time rumping up Switch or if Sony read better the demand. But I agree with you that between the 1-2 months on shipping channels, new contracts, preparation and all 3-6 months to totally answer a shortage. We weren't saying holiday doesn't impact demand (we know it does) nor that launching in a holiday wouldn't (it could). The point was just that if the console was sold out out of holiday launch there isn't much impact on sales that launching on holiday would cause because there would be no extra supply (even more when we had all those reports of lack of parts for Switch).
Man, you think you gave good possibilities. You thinking it is a good reason doesn't make it a good reason. Those you gave would surpass a 5M storing cost. Yes preparing and after launch are different, with before launch usually being even slower than after launch. But you are yet to explain how would Nintendo suddenly be able to make 4M consoles when they couldn't make 2M (that sold out instantly) and took 8 months to improve production. Also you won't be able to explain why hold 8 months to a launch to have that many consoles. |
I did gave you, again there is possibility they can maybe sell whole 30m, there is possibility we will again have Switch parts shortages, or that they currently have great deal for Switch parts. And again, ts not like they will produce 5m in one day and conserve them for next FY (lol), production is through the whole year, which means that if Nintendo observe that they need to slow down (or speed up) production, they can take appropriate action. All this are logical possibility, and nothing is set in stone. But like I alredy wrote to you, what ever suits you, you constantly ignoring points that I made, I am done here, you so you can continue with this alone..
Again, they never said they couldn't prepare more than 2m, fact is that their initial plan was 2m and they prepared 2m acording to their plan, and they actually shipped at end of March 700k more units. If plan and contracts from start were 4m instead 2m, they could prepare that. Problem with production is to increase production from numbers you already have according to plan and contracts.







