Solid-Stark said:
So Kaveri and Steamroller will be 28nm for sure then, what of Excavator. From the looks of things, Excavator can very well be Q4 2014 or Q1 2015 and at 20nm likely. That would be great considering bully Intel will be at 14nm. ( AMD, Nvidia and IBM at 20nm during the same period) |
1. AMD do not have a 20nm process available to them. Not in 2014, not ever.
2. Excavator is most likely cancelled.







