By using this site, you agree to our Privacy Policy and our Terms of Use. Close
Solid-Stark said:
CGI-Quality said:
Solid-Stark said:
So two A series APUs in 2013? I thought Steamroller was delayed till 2014? Anyway, good to see AMD progressing.

Seems like they're on a roll. Here I was ready to right them off late last year!


Yup. I'm glad they're not falling too behind in their own domain. My future build will be AMD based.

So Kaveri and Steamroller will be 28nm for sure then, what of Excavator. From the looks of things, Excavator can very well be Q4 2014 or Q1 2015 and at 20nm likely. That would be great considering bully Intel will be at 14nm. ( AMD, Nvidia and IBM at 20nm during the same period)

1. AMD do not have a 20nm process available to them. Not in 2014, not ever.

2. Excavator is most likely cancelled.