WilliamWatts said:
superchunk said:
You know precisely what was involved in this? Wow, You must have some serious insider knowledge.
|
The GPU is produced on its own package with the GDDR3. To change from a 65nm to 40nm chip all they have to do is change the package. The only reason why they would have to have shortages is if they screwed up the logistics and either failed to produce enough 65nm parts or if they are slower to ramp the 40nm parts than expected. The packages are pretty interchangeable, all they have to do is substitute one for the other when they have enough supply.
|
You assume too much. You have no idea what else they could have revised while they were working on the new GPU.
Point is that its a known fact it was in very short supply and that coincided with the end of the holidays and the change to a revised system.